EWE+ General partnership

Quality is our specialty

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Single-Project

Project Modern And Futuristic Homes

PROGEO-TBT Intervention

Study of the construction sequence of the York University Station shoring and the settlements and posible damage to building nearby.


TBT – Tunnel and Bridge Technologies S.L.

Key Features

  • Toronto underground line extension from Sheppard West Station to Vaughan Metropolitan centre stations (York Spadina).
  • Twin tunnel with two 6.05 m diameter Earth Pressure Balanced (EPB) tunnel boring machines.
  • Stations were built with cut and cover procedure.

Modern Housing

Toronto (Canada)

OHL – FCC Limited Partnership 2012-13

Related

JOIN OUR

NEWSLETTER

Stay updated with the latest industry insights and project highlights by joining our newsletter. Subscribe now to stay connected with EWE+ GENERAL PARTNERSHIP!

×