EWE+ General partnership

Quality is our specialty

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Toronto York Spadina Subway Extension – 407 Station

Toronto York Spadina Subway Extension – 407 Station

PROGEO-TBT Intervention​

Study of the construction procedure of 407 Station, with analysis of the shoring and modifications in the inner final structure to take into account all intermediate phases before the permanent state.


TBT – Tunnel and Bridge Technologies S.L.

Image Title
Image Description
Image Title
Image Description

Key Features

Subway underground station. It consists of an enclosure with a shoring of steel piles with tiebacks. Inside it a permanent structure totally independent of the shoring is built. The dimensions are 164.5 m in length, 22 m in width, 18 m in depth

Toronto York Spadina Subway Extension – 407 Station

Toronto (Canada)

OHL – FCC Limited Partnership 2012-13

Related

JOIN OUR

NEWSLETTER

Stay updated with the latest industry insights and project highlights by joining our newsletter. Subscribe now to stay connected with EWE+ GENERAL PARTNERSHIP!

×