Eglinton Crosstown LRT 2016-20

Geomechanical modelling of the following stations: Fairbank, Forest Hill, Chaplin and Mount Pleasant. We have cooperated also in some issues regarding East Portal area and Science Centre Station.
Revision of the Geotechnical Design Reports
Design of deep foundations
Toronto York Spadina Subway Extension – York University Station

Study of the construction sequence of the York University Station shoring and the settlements and posible damage to building nearby
Toronto York Spadina Subway Extension – 407 Station

Study of the construction procedure of 407 Station, with analysis of the shoring and modifications in the inner final structure to take into account all intermediate phases before the permanent state.
Toronto York Spadina Subway Extension – Schulich Building

Design of the tunneling under Schulich building with no damage and without compensation grouting. This study has been published in “Canadian Journal of Civil Engineering” https://doi.org/10.1139/cjce-2017-0062
Scarborough Subway Extension Advanced Tunnel Project

Geotechnical and Structural Design during Request for Proposal process
Eglinton Crosstown West Extension Advanced Tunnel Project

Geotechnical and Structural Design during Request for Proposal process
REM Project

Aerodynamic Analysis of the train running inside the tunnel for the estimation of Piston-effect.
Design of Fire Separation Wall inside the tunnel.
Broadway Project-Temporary Decks Design

Design of Temporary Decks over two of the Underground Stations.
Centerm Expansion Project Vancouver

Optimization of Structural Design for the Caissons
Finch West LRT

Technical Advisors and Value Engineering for the Construction Joint Venture
